Solar Status 10-17-24
I have the batteries and controller on site. I also still have the 20 old unused solar panels here. I just ordered a set of battery cables to …
I have the batteries and controller on site. I also still have the 20 old unused solar panels here. I just ordered a set of battery cables to …
I am waiting on the crematorium to tell me I can pick up O’Lenas ashes. I assume it will be Monday. I went to Waikoloa Village Friday to …
It is a busy month what with me working on the farm, getting ready for a solar power install, doing some accounting and cleaning house. I also have …
Power from the two solar strings will go into the controller which it converts from DC to AC. That power can charge the batteries and/or go to the …